8/26/12/ Sharon Gach >>>
Campus Boulevard is progressing with entrances open to the Cafeteria, and Safety & Health Center (Bldg. 1700), Library (Bldg. 2000), and entrance to North Door of Multi-Disciplinary Bldg. (MDB, Bldg 2400) open [up the stairs]. See map.
We will keep you posted about the path between Bldgs. 2100 & 2400 up the hill to the Physical Education Complex (Bldg. 2500).
>>> Renee Pegues 7/18/2012 11:56 AM >>>
In our continued effort to keep the campus community informed....
The temporary pathway thru the center of campus will be closed starting Monday, July 23 until Sunday, August 12. Attached is [an old] diagram showing the pedestrian pathways during this next phase of construction for the Campus Blvd. The red line designates the pedestrian routes.
Library - Please be aware we will continue to use the alternate route into the library via the North side.
Building 2100 - All users of Building 2100 will still need to use the east side entrances between Building 2200 and 2100. All doors on the South and West side of the building will remain Emergency exits.
We apologize for any inconvenience this may cause and appreciate your patience during the next three weeks. This closure is necessary so that we are ready for beginning of the fall semester.
Thanks! Renee Pegues, Executive Assistant, Administrative Services
For questions please contact [Renee Pegues] via email: rpegues@laspositascollege.edu , or by phone: 925.424.1631.
>>> Renee Pegues 5/31/2012 9:31 AM >>>
As many of you are aware the construction fencing has been put into place for the construction of the Campus Blvd....
1. All exit doors from Buildings 2000 and 2100 into the construction zone will be labeled as Emergency Exits Only.
2. The Library Staff will be sealing their main front sliding door to reduce the amount of dust and debris from entering the building. These doors will remain inoperable during construction.
3. The doors on either side of the main door will become the Emergency Exits.
Again, thank you for your patience! It is much appreciated.
***
May 29, 2012: Good morning everyone! In our continued effort to keep the campus community informed....
Attached is a diagram showing the pedestrian pathways during this phase of construction for the Campus Blvd.
The red dashes designate the pedestrian routes.
Library - Please be aware the front of the library will be closed and we will be establishing a alternate entrance into the library via the North side. We will be posting way finding signs designating the temporary entrance.
Building 2100 - All users of Building 2100 will need to use the East side entrance between Building 2200 and 2100. All doors on the South and West side of the building will be designated as Emergency exits.
***
We apologize for any inconvenience this may cause and appreciate your patience during the coming months.
Thanks! For questions please contact [Renee Pegues] via email: rpegues@laspositascollege.edu , or by phone: 925.424.1631.